The good news is that the epoxy worked and bonded the stem and keelson. It was a lot of work with the power planer and manual planes to get it to this stage.
It would have been easier to cut the hole for the center board before we put this bevel in it.
These are the floors in the making. Because I don't have any 1 inch stock. I am laminating 2 pieces of 3/4 inch then I will plane them down and fix the sloppy shape. They go on against the molds and keelson before starting to put on the planks.
No comments:
Post a Comment